Mineral Resources consist of sand dumps, slimes dams and silted ‘vlei’ areas and dams. Before dumps are included as Mineral Resources, they are evaluated by drilling and an engineering study is undertaken to determine infrastructure needs.
Competent Persons | Title | Address | Qualifications | Years |
---|---|---|---|---|
Mpfariseni Mudau Pr.Sci.Nat. 400305/12 |
Director of The RVN Group Proprietary Limited |
Willowbrook Villas 21, Van Hoof St, Roodepoort, 1724 |
BSc (Hons) – Geology, MSc (Mining Engineering) |
15 |
Professor Steven Rupprecht FSAIMM 701013 |
Associate Principal Mining Engineer of the RVN Group | Willowbrook Villas 21, Van Hoof St, Roodepoort, 1724 |
BSc. Mining Engineering PhD. Mechanical Engineering |
34 |
Diana van Buren Pr.Sci.Nat. 400107/14 |
Partner of Sound Mining Solution Proprietary Limited | Sound Mining House, 2A Fifth Avenue, Rivonia, 2128 |
BSc (Hons) – Geology | 13 |
Vaughn Duke Pr. Eng 940314 FSAIMM 37179 |
Partner of Sound Mining Solution Proprietary Limited | Sound Mining House, 2A Fifth Avenue, Rivonia, 2128 |
BSc Mining Engineering (Hons), MBA |
37 |
MEASURED | INDICATED | |||||||
---|---|---|---|---|---|---|---|---|
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
|
Ergo 1 | 282.95 | 0.309 | 87.42 | 2.81 | 574.95 | 0.250 | 143.70 | 4.61 |
FWGR | 244.85 | 0.337 | 82.44 | 2.65 | – | – | – | – |
Total Mineral Resources as at 30 June 2021 |
527.80 | 0.325 | 169.86 | 5.46 | 574.95 | 0.250 | 143.70 | 4.61 |
Total Mineral Resources as at 30 June 2020 |
548.24 | 0.325 | 177.96 | 5.73 | 379.49 | 0.251 | 95.08 | 3.06 |
INFERRED | TOTAL | |||||||
---|---|---|---|---|---|---|---|---|
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
|
Ergo 1 | 21.32 | 0.240 | 5.12 | 0.16 | 879.22 | 0.269 | 236.24 | 7.58 |
FWGR | – | – | – | – | 244.85 | 0.337 | 82.44 | 2.65 |
Total Mineral Resources as at 30 June 2021 |
21.32 | 0.240 | 5.12 | 0.16 | 1124.07 | 0.284 | 318.68 | 10.23 |
Total Mineral Resources as at 30 June 2020 |
207.43 | 0.240 | 349.83 | 1.60 | 1 135.16 | 0.284 | 322.87 | 10.39 |
1 1.49Moz (192.79Mt @ 0.24g/t) of the Daggafontein TSF reclassified from Inferred Mineral Resource to Indicated Mineral Resource.
2 The figures contained in the tables are rounded, which may result in minor computational discrepancies which are not deemed to be significant
MEASURED | INDICATED | |||||||
---|---|---|---|---|---|---|---|---|
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
|
Ergo | 310.26 | 0.313 | 97.22 | 3.13 | 379.49 | 0.251 | 95.08 | 3.06 |
FWGR | 237.98 | 0.339 | 85.85 | 2.60 | – | – | – | – |
Total Mineral Resources as at 30 June 2020 |
548.24 | 0.325 | 39.94 | 5.73 | 379.49 | 0.251 | 95.08 | 3.06 |
Total Mineral Resources as at 30 June 2019 |
557.33 | 0.322 | 0.322 | 5.77 | 339.69 | 0.253 | 85.85 | 2.76 |
INFERRED | TOTAL | |||||||
---|---|---|---|---|---|---|---|---|
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
|
Ergo | 207.43 | 0.240 | 49.83 | 1.60 | 897.18 | 0.270 | 242.13 | 7.79 |
FWGR | – | – | – | – | 237.98 | 0.339 | 80.74 | 2.60 |
Total Mineral Resources as at 30 June 2020 |
207.43 | 0.240 | 49.83 | 1.60 | 1135.16 | 0.284 | 322.87 | 10.39 |
Total Mineral Resources as at 30 June 2019 |
200.51 | 0.199 | 39.94 | 1.28 | 1 097.53 | 0.278 | 305.42 | 9.81 |
Mineral Resources reported include Mineral Reserves
PROVED Delivered to plant |
|||||
---|---|---|---|---|---|
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
||
Ergo | 29.36 | 0.300 | 8.81 | 0.28 | |
FWGR | 222.27 | 0.337 | 74.79 | 2.40 | |
Total Mineral Resources as at 30 June 2021 |
251.63 | 0.333 | 86.73 | 2.68 | |
Total Mineral Resources as at 30 June 2020 |
270.66 | 0.333 | 90.16 | 2.90 |
PROBABLE Delivered to plant |
|||||
---|---|---|---|---|---|
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
||
Ergo | 253.59 | 0.310 | 78.61 | 2.53 | |
FWGR | 12.88 | 0.330 | 4.24 | 0.14 | |
Total Mineral Resources as at 30 June 2021 |
266.47 | 0.311 | 82.85 | 2.67 | |
Total Mineral Resources as at 30 June 2020 |
277.59 | 0.316 | 87.80 | 2.83 |
TOTAL MINERAL RESERVES Delivered to plant |
||||
---|---|---|---|---|
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
|
Ergo | 282.95 | 0.309 | 87.42 | 2.81 |
FWGR | 235.14 | 0.336 | 79.03 | 2.54 |
Total Mineral Resources as at 30 June 2021 |
518.10 | 0.321 | 166.45 | 5.35 |
Total Mineral Resources as at 30 June 2020 |
548.25 | 0.325 | 177.96 | 5.73 |
PROVED Delivered to plant |
|||||
---|---|---|---|---|---|
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
||
Ergo | 45.37 | 0.300 | 13.61 | 0.44 | |
FWGR | 225.29 | 0.340 | 76.55 | 2.46 | |
Total Mineral Resources as at 30 June 2020 |
270.66 | 0.333 | 90.16 | 2.90 | |
Total Mineral Resources as at 30 June 20191 |
232.75 | 0.350 | 81.38 | 2.61 |
1 Proved Mineral Reserves incorrectly disclosed as 2.61Moz (232.75Mt@ 0.352g/t) in the 30 June 2019 annual integrated report
PROBABLE Delivered to plant |
|||||
---|---|---|---|---|---|
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
||
Ergo | 264.89 | 0.316 | 83.61 | 2.69 | |
FWGR | 12.70 | 0.330 | 4.19 | 0.14 | |
Total Mineral Resources as at 30 June 2020 |
277.59 | 0.316 | 87.80 | 2.83 | |
Total Mineral Resources as at 30 June 20191 |
324.58 | 0.303 | 98.26 | 3.16 |
1 Probable Mineral Reserves incorrectly disclosed as 3.16Moz (324.58Mt@ 0.311g/t) in the 30 June 2019 annual integrated report
TOTAL MINERAL RESERVES Delivered to plant |
||||
---|---|---|---|---|
Tonnes Mt |
Grade g/t |
Contents Au tonnes |
Contents Moz |
|
Ergo | 310.26 | 0.313 | 97.22 | 3.13 |
FWGR | 237.99 | 0.339 | 80.74 | 2.60 |
Total Mineral Resources as at 30 June 2020 |
548.25 | 0.325 | 177.96 | 5.73 |
Total Mineral Resources as at 30 June 2019 |
557.33 | 0.322 | 179.63 | 5.77 |
The figures contained in the tables are rounded, which may result in minor computational discrepancies which are not deemed to be significant