ERPM

Printer friendly Printer icon

East Rand Proprietary Mines (ERPM) is an underground mining operation which was established well over 100 years ago on the Witwatersrand Basin, 25 kilometres to the east of Johannesburg. Situated near the town of Boksburg, the mine was purchased in October 2002 by Crown Gold Recoveries (CGR). ERPM is now a wholly owned subsidiary of DRDGOLD SA.

Gold production totalled 79 479 ounces in the year to 30 June 2008.

Underground mining activities take place in the Far East Vertical (FEV) Shaft lease area while the infrastructure of the South East Vertical (SEV) Shaft is being maintained for hoisting and pumping as well as for accessing mining in remnant areas. The Main Reef formation is mined at depths of up to 3 200 metres beneath the surface. The plugging programme – the construction of underground dams to prevent rising water in the Central Witwatersrand Basin from flowing into the remaining production areas – was completed at FEV shaft and is 95% complete at SEV. The programme is partially funded by the government.

The mine also produces gold from its Cason Dump surface re-treatment operation. Some 300 000 tonnes of underground ore are processed through the ERPM plant a year, while 1.9 million tonnes of surface materials are process through Crown’s Knights plant.

Growth projects

Early in 2006 DRDGOLD SA was granted prospecting rights under South Africa’s new minerals legislation in respect of the Sallies lease area adjacent to ERPM which is now known as ERPM Extension. A four-year exploration drilling programme is under way.

A concept study to determine how best to access the ERPM Extension 1 orebody was completed in the last quarter of FY08. This favours the development of a new ‘pay-as-you-go’ decline that circumvents the existing decline and uses technology that is proven to be both safer and more reliable. A feasibility study has been approved and is scheduled for completion by the end of 2008.

Once a mining right has been granted for Extension 1, it will allow the Composite Reef payshoot currently being mined on ERPM to be followed across the existing mine boundary. With mineral resources of 7.8 million ounces at 8.35g/t, this project has the potential to extend the life of mine from nine to more than 20 years.

Beyond the Sallies area (ERPM Extension 2), application has been made to extend the prospecting area into the 5 500ha Rooikraal/Withok area where independent consultants (Camden Geoserve and Minxcon) have estimated an inferred resource of 28.6Mt grading 9.06 g/t, a total of 8.3Moz. Should drilling confirm initial estimates, a due diligence exercise will be carried out which could culminate in a deep-level mine with a life of more than 15 years.

At the end of June 2008, ERPM employed 1 900 people including contractors.

Following the death of two employees overcome by carbon dioxide at the SWV Shaft on 19 September 2008, underground pumping at ERPM had to be discontinued. This led to the suspension of underground drilling and blasting on 31 October 2008. A process is in place to try to find an economic solution to the problem but with no success thus far. Consultations are being held with union representatives to determine the future of the mine’s workforce.

Surface operations at ERPM continue.

ERPM Mine Plan 2008

ERPM Value Distribution Plan 2008
Enlarge ERPM: Underground Plan

Enlarge ERPM: Underground Plan

ERPM key statistics

 
12 months to
30 Jun 2008
12 months to
30 Jun 2007
Ore milled
    Undergroundt’000303269
    Surfacet’0001 8591 753
    Totalt’0002 1622 022
Yield
    Undergroundg/t5.836.71
    Surfaceg/t0.380.39
    Totalg/t1.141.23
Gold produced
    Undergroundoz56 81258 063
 kg1 7671 806
    Surfaceoz22 66722 153
 kg705689
    Totaloz79 47980 216
 kg2 4722 495
Cash operating costs
    UndergroundUS$ per oz812654
 ZAR per kg190 938151 816
 ZAR per tonne1 1131 019
    SurfaceUS$ per oz588606
 ZAR per kg138 250140 719
 ZAR per tonne5255
    TotalUS$ per oz748641
 ZAR per kg175 912148 751
 ZAR per tonne201184
Cash operating (loss)/profitUS$ million4.4(0.5)
 ZAR million32.2(3.8)
Capital expenditure (net)US$ million4.15.6
 ZAR million30.140.6

^Back to top...
© 2008 DRDGOLD Limited | Disclaimer | Privacy | Accessibility

South Africa

map of South Africa

DRDGOLD SA

ERPM fact sheet

ERPM fact sheet PDF
ERPM fact sheet - March 2007
(PDF – 78KB)
 

Reserves & resources

Photo gallery

ERPM MineERPM minersSafety board